South Casky September 27, 2006
| Description |
: |
This is the new high spped switch at South Casky. This section (some 4 1/2 miles is now designated as a two track section and not a siding. The switches at both ends are set with concrete ties. There is a double crossover in about the center of the two track segment. Chuck Hinrichs |