We're sad to report that Dennis Carnal passed away this morning at Regional Medical Center here in Madisonville. Funeral arrangements and further details will be posted as they become available. We'll all miss the "Old Goat."
Photo by Bill Thomas

Greetings all.  It is with sadness that I pass word to you that Dennis J. Carnal passed away last night (Monday, September 12) around midnight, at Regional Medical Center, from what appears to have been an embolism brought on by unknown circumstances.  Dennis had been suffering from occasional seizures for a couple of weeks.  Keith Kittinger and I carried him home from my house Saturday.  He saw a Dr. at Multicare Monday, suffered another seizure while there, was admitted to RMC, then died that evening.

His cousin Peggy, Keith and I met with Reid Walters funeral home this morning.  Dennis will be cremated and buried in the Earlington Cemetery alongside his mother and father.

At Dennis’ request there will be no public service of remembrance.  I suggest as a chapter we collect a donation for one of Dennis’ passions.  Disaster Relief/Emergency Management or American Red Cross Disaster relief.  I’ll not make the next meeting due to a conflict at the Glema Mahr Center for the Arts.

I’d like to host a Thursday night get-together sometime soon at the house, build a roaring campfire (Dennis hated the fire pit) and roast some hotdogs while we give a memory roasting to the Old Goat!

Take care guys! – Bill Thomas

For Sale: a very limited number of the Earlington Bee Newspaper Coal Mining and Railroad Supplement are still available.  This special supplement was printed December 3, 1903.  This 49 page supplement is printed in magazine style on 11×16 inch heavy stock paper.

The edition contains ten chapters.  Three chapters devoted to the L&N Railroad Henderson Division, including over 75 bios on railroad employees at Earlington.  Bios cover jobs worked, longest time on duty without rest, and fastest running time on the division, etc.

Other chapters cover history of Western Kentucky coal fields, leading coal companies in the area and bios of the leaders in the coal business.  Another chapter covers the history of Earlington.  Many photographs are provided, giving readers a look at life in Western Kentucky during the early 1900’s.

Twenty Three pages are devoted to ads for business in Earlington, Madisonville, and Evansville.  A must buy for new and or out-of-state members.  The cost of the 1903 Earlington Bee supplement is $10.00 each, plus $6.00 postage and handling.  Proceeds from sales go to the Earlington Schools Reunion Association.  Make checks payable to Dennis J. Carnal.  Mail orders to Dennis Carnal, 704 Choctaw Drive, Madisonville, KY 42431.  Phone 270-584-5491.

Submitted by Dennis Carnal, (a reprint from L&N Magazine, October 1956)

Shovel crosses the L&N's tracks.
Shovel crosses the L&N's tracks.

Even if the way is clear, the moving of a 1,200-ton electric shovel some three miles across the county wouldn’t be easy.

Such a three-mile jaunt – made by a 1,200-ton electric shovel, belonging to the Homestead Coal Company, to a new strip mining area at White City, near Morton (now Morton’s Gap), KY, – was climaxed recently by moving the mechanical monster across the L&N main track and U. S. Highway No. 41, south of Morton.

Previously, for the past nine years or so, the big shovel had been hard at work at the Homestead Mine near Nortonville, KY, and had finally worked itself out of a job-temporarily at least.

This big shovel propels itself along on four double sets of caterpillar tracks with its boom facing forward.  It is powered by a 5,000-volt electric power supply and drags up to 6400 feet of special high voltage cable.  It has a rated capacity of 35 cubic yards of dirt but is normally equipped with a 20-cubic yard bucket whose size can be appreciated by the accompanying picture.

The crossing of our tracks and the highway was planned by Homestead Superintendent Frank Gilbert, working with representatives of the L&N’s maintenance of way department, the Kentucky Highway Department and the American Telephone and Telegraph Company whose lines are on our right of way.  Prior to the day set for crossing the tracks, all telephone and signal wires had been replaced with underground cables in pipe conduit; large corrugated pipe had been installed to carry surface water in the various drainage ditches and the approach fill had been constructed.  Several hundred cubic yards of dirt were also stockpiled nearby to be used as a “cushion” across the railroad and highway.

To protect the railroad and highway from the enormous weight of the shovel it had been decided to cover them with a four-foot earth fill and, in turn, use 18-inch timber mats on top of the fill for the shovel to move over.  With the passing of No. 66, a northbound freight, the big job of filling over the tracks began.  About an hour later the shovel was crossing our tracks and the highway was being covered and highway traffic was detoured over the fill covering the railroad.  Shortly there after the shovel crossed the highway and connected into a power line previously constructed on that side, thereby clearing the way for the gigantic cleanup job of removing the earth fill from the railroad and highway.

By carefully planning the work and scheduling the time of the crossing, the entire operation was completed in two hours with no delay to trains and a few minutes delay to highway traffic.  Several hundred on-lookers were on hand to give the matter their undivided attention and to watch history being made as the Railroad handled its largest movement ever.

Original article by M. W. Cox, Assistant Division Engineer, Evansville, IN.

Submitted by Dennis Carnal

This is the first in a series of articles and photographs linking coal mining and the L&N Railroad during the 1930s till the 1970s.  We will start with an article covering the first coal mine in Hopkins County to produce over two million tones of coal in one year.  This production was done by the somewhat new use of surface or strip mining.  Strip mining was a much cheaper way to mine coal during this time period, than underground mining.

The mine covered by this article was the Homestead Coal Company, opened during 1946.  The coal reserves in this area were owned by The West Kentucky Coal Company.  The area covered by this mine was bordered by Highway 41 between Earlington and Nortonville on the east.  By Highways 112 and 454 between Earlington and St. Charles on the north and west.  By Highway 62 between Nortonville and St. Charles on the south.  The area north of St. Charles had been mined by the Fox Run Mine during the early 1900s.

The coal was mined by two electric power shovels.  One shovel built by the Bucyrus-Erie Company had a 35 cubic yard bucket.  The other shovel was built by the Marion machinery company and had a 20 cubic yard bucket.

“Buster” at work in the Homestead strip mine.
“Buster” at work in the Homestead strip mine.

In June 1955, Peabody Coal Company purchased Homestead Coal Company.  In 1955, employment and production peaked.  During 1955, 240 miners produced 2,307,557 tons of coal.  Employment and production totals dropped until 1959, when the mine closed and all remaining equipment was moved to the newer White City mine, east of Mortons Gap.

Now, please read excerpts from a story covering the Homestead Mine from the September 1948 issue of the L&N Magazine.  Next month look for a story from the October 1956 issue of the L&N Magazine about a 1,200 ton monster movement over the L&N Henderson Subdivision between Mortons Gap and Nortonville.

Homestead mine is one of the newest and largest coal mines served by the Old Reliable.  It is not the only strip, or open-pit mine on our lines, although these are comparatively few, but it is certainly the most impressive.  It is located in Hopkins County, down in Western Kentucky near Nortonville, and is served by our Homestead Branch, which was completed in the later part of 1946.  This 4.74-mile long spur is an offshoot of the Evansville-Nashville line and about one-third of it was built jointly with the Illinois Central, which thus also services the development.

Looking south, the Homestead branch diverges from the Henderson Sub main, near present location of WK overpass.
Looking south, the Homestead branch diverges from the Henderson Sub main, near present location of WK overpass.

Homestead Mine was placed in operation shortly after the completion of the Branch and ever since has been funneling a cascade of high-grade bituminous coal into our waiting cars.  (It has a rating of 9,000 tons, or 180 cars per day.)

The seams being mined at Homestead are the No. 11 and No. 12 ones, the No. 9 seam, further on down in the bosom of the earth, generally having already been mined by underground methods throughout the area.  Atop the No. 12 is some 50 to 80 feet of overburden.  The No. 12 seam, which averages around four and one-half feet thick, is separated from the No. 11 seam, which runs around six and one-half feet thick, by about seven to eight feet of limestone rock.  Hence, before the seams can be mined, some changes obviously have to be made.

An essential ingredient in the strip mining of coal at Homestead is “Buster,” a “million-dollar baby’” produced by the Bucyrus-Erie people, who have long specialized in the manufacture of custom-built, heavy-duty excavating machinery.  “Buster” – an appellation originating with the writer, is a giant, electrically-operated shovel, towering some 100 feet above the ground and weighing some 1,600 tons.  It removes the overburden in huge, 35-cubic yard bites, piling the rock and earth expertly to one side in small-sized Alps, and inching its way forward between munches at the rate of about one-tenth of a mile an hour.  (Incidentally, it took 46 freight cars to transport the component parts of this colossus to Homestead for assembly.)

The giant shovel is followed by bulldozers which remove the miscellaneous debris which escape the former’s maw.  Then a smaller edition of “Buster,” but Diesel-powered, moves in to mine the coal, scooping it up and dumping it 15 to 20 tons at a time into the waiting trucks, some of which have a capacity as great as 40 tons.

The trucks roar away to a dumping apron atop the head end of a conveyor belt—the reception room of a “beauty shop” some 600 feet distant.  The belt, which is trestled across the valley in an enclosed structure, trundles the coal along at a fast rate of speed to the cleaning and preparation plant, whose attractive buildings resemble some huge, modernistic hotel.  Here an inky Niagara of coal, seemingly sufficient to feed the furnaces of all the nation’s homes and industries, dumps continuously on a jiggling apron of steel, punched with holes of varying sizes, like a bagatelle board.  This separates the coal into three sizes prior to washing, and watchful eyes and expert hands remove debris such as sticks, rock, and the like, which are surprisingly rare at that.

Generally speaking, coal is lighter than its accompanying impurities. Hence, a system of “floating” the coal and “sinking” the impurities is effectively used at Homestead to separate the coal from its dross.  This is done by passing the coal through rushing streams of chemically-treated water, the chemicals, i.e.., calcium chloride, zinc chloride, and the like, hastening the separation process.

Homestead Mine
Homestead Mine

The refuse coal, etc., is conveyed back across the valley for dumping by another conveyor belt.  The raw coal loses from 15 to 18 percent of its weight in the washing and cleaning process.

After the coal has parted company with its “fellow travelers” the moisture is removed by an automatic de-watering and drying system and the coal is then further screened into various sizes—lump, egg, nut, and slack  – for special uses—industrial, domestic, steam plant, stoker, and so on.

Not over 30 minutes have elapsed since it was first scooped from the ground.  Some of it is placed in storage but most is promptly conveyed by gravity into the waiting coal cars of the Old Reliable—or of the Illinois Central. (at present writing we are hauling about 2/3s of the tonnage.)  Here again gravity supplies the motive power, delivering the cars onto one of the tracks of a six-track storage yard with a capacity of 150 cars.  Mine runs then haul the hoppers into the make-up yard at Earlington, KY, and the long, solid coal trains are soon rumbling their way north, east, south and west.

West Kentucky Coal offices in 1948 - now home of OMHS Mulicare offices and clinic, Madisonville, KY.
West Kentucky Coal offices in 1948 - now home of OMHS Mulicare offices and clinic, Madisonville, KY.

On August 18 (1948), it (West Kentucky Coal) moved its general offices from Earlington into a modern, spacious and air-conditioned three-story structure at Madisonville (present day Multicare facility).  Here 75 employees will continue to guide and direct the destinies of a business whose output in 1947 was topped by only 18 other coal producers in the entire country.